Noticias

KIMUA Group goes one step forward by obtaining ISO 3834-2 and EN 1090-2 certificates

KIMUA Group adds two new Official recognitions to its range of credentials: ISO 3834-2:2006 and EN 1090-2:2011 (EXC 3); accordingly, KIMUA Group can now ensure the maximum quality of its welded products since the beginning and optimize the whole welding process, thanks to the tight quality control that is mandatory for meeting the guidelines of both standards.

Furthermore, both standards complement each other.  On the one hand, ISO 3834-2:2006 establishes the competence levels for welding metallic materials, as well as the capabilities and staff requirements for such a specific scope of activity.  On the other, EN 1090-2:2011 (EXC 3) sets the framework for establishing a complete Welding Quality Management System, where protocols, control procedures, surveillance milestones and records are implemented to allow a strict traceability of the full fabrication process.

Last but not least, KIMUA Group announces that it has started working side by side together with DNV-GL in Germany and Spain for certifying its solutions from designing to manufacturing and thus, providing its clients with DNV-GL certified solutions when they require it.

See ISO3834-2:2006 and EN 1090-2:2011 (EXC 3) certificates here.

         

ISO 3834 2 en Kimua Group UNE EN 1090 2 Kimua Group

KIMUA will attend the next AWEA Wind Power 2016 to take place from May 23 to 26 in New Orleans

awea-windpower-2016

 

AWEA WINDPOWER is a must for anyone connected with the Wind Power Industry in North America; therefore, professionals and representatives from companies from all over the world will be in New Orleans networking, learning and outlining the future of the Wind Power Industry, especially in the US Market.

KIMUA didn’t want to miss this amazing opportunity to reach out to its existing clients while growing new seeds of interest within potential ones.

Hence, in case you are interested in setting an appointment with any of KIMUA’s representatives attending the exhibition, please get in touch with them by accessing to their contact details linked to the following QR codes.

Lucas Mejía, Sales Manager

QR LUCAS MEJIA

Luis Martín, Project Manager

QR LUIS MARTIN

 

We expect you all there at AWEA WINDPOWER 2016. 

WP16logo small

KIMUA takes part in the first Offshore Wind Farm of United States

KIMUA takes part in the first Offshore Wind Farm of United States by engineering and manufacturing a Tower Assembly and Storage Frame; KIMUA’s tool is currently being used in the erection of GE’s wind turbines at its Tower Assembly Facility in Providence Port (Rhode Island).

Wacth the following video published by GE:

video vimeo

Source: General Electric. Block Island Wind Farm Tower Assembly Event at ProvPort from Deepwater Wind on Vimeo.

 

Good reception during the first day of EWEA Paris 2015

The first day at EWEA PARIS 2015 was amazing, despite the sad events of last Friday.  KIMUA’s booth received many visitors from different companies related to the WIND POWER INDUSTRY.

Among our visits of yesterday, it´s remarkable the meeting that we have supported with representatives of the Basque institutions: Javier Zarraonandia,Vice Councillor for Industry in the Basque Government; Alexander Arriola, General Manager for SPRI (Business Development Basque Agency) and José Ignacio Hormaeche, General Manager for Energy Cluster.

During this EWEA edition there are more than 350 companies from many sectors attending the exhibition, besides, it is expected that the number of visitors increases as it develops. 

 

Kimua Group

Oficinas centrales

Kimua Group S.L.
Ibaiondo Bailara, 11
20271 Irura
País Vasco (España)
info@kimuagroup.com
Tlf.: +34 943 691396

Delegación Barcelona

Kimua Group BCN
L. Martin
Project Manager
martin@kimuagroup.com
Barcelona

Kimua Group France

Kimua France SARL
Toki Eder - App.7
13 rue des Eucalyptus
64700 Hendaye (France)
info@kimuagroup.com
Telf: (+33) 975 128 220

ISO 9001