KIMUA takes part in the first Offshore Wind Farm of United States by engineering and manufacturing a Tower Assembly and Storage Frame; KIMUA’s tool is currently being used in the erection of GE’s wind turbines at its Tower Assembly Facility in Providence Port (Rhode Island).
Wacth the following video published by GE:
Source: General Electric. Block Island Wind Farm Tower Assembly Event at ProvPort from Deepwater Wind on Vimeo.
Kimua will be present at WindEurope 2025 in Copenhagen, showcasing solutions like Heldu and Tartalo. In addition, they will offer services through Kimua Air, Kimua Port, and Basajaun, providing a comprehensive package: design, manufacturing, testing, and commissioning. Don’t miss it!
This year we participated in OMS 2025 (Operations, Maintenance & Safety Conference), the reference event for the operation and maintenance of wind farms, organized by American Clean Power (ACP).
KIMUA launches the Basajaun Testing Site at the Port of Pasaia, a facility designed to test lifting solutions in the offshore wind industry.